5.6 Input Test
Input Test (PLC Operands) Customer: Sheet: 1/1 Control Manufacturer: Siemens Customer No.: Date: 30.11.2006 Control Type: S7 Order No.: Plant No.: Order Ref.: Conversion of two HPS conveyor belt models to three-phase drive and control via PROFIBUS-DP
Device to be tested:PLC Operand: Status
of Operand: Matches Assignment List?S1 HPSF_1_stop Normally Open 0 E0.0 1 OkS1 HPSF_1_stop Normally Open 1 E0.0 0 OkS2 HPSF_1_right_slow Normally Closed 0 E0.1 1 OkS2 HPSF_1_right_slow Normally Closed 1 E0.1 0 OkS3 HPSF_1_right_fast Normally Closed 0 E0.2 1 OkS3 HPSF_1_right_fast Normally Closed 1 E0.2 0 OkS4 HPSF_1_left_slow Normally Closed 0 E0.3 1 OkS4 HPSF_1_left_slow Normally Closed 1 E0.3 0 OkS5 HPSF_1_left_fast Normally Closed 0 E0.4 1 OkS5 HPSF_1_left_fast Normally Closed 1 E0.4 0 Ok