8.0 Measurement and Test Protocol

Test protocol according to VDE 0113/EN 60204, BGV A3

Test Protocol No.:
Order No. and/or Description:

Reason for Test

Applicable Initial Test Not Applicable Retest   Not Applicable Modification  Not Applicable Repair 

Inspection:

Applicable Equipment can withstand environmental influences at the site of use (protection class)
Applicable Labeling, connection points, and any separations in order
Applicable No visible damage Applicable PE, L, and N not interchanged
Applicable Protective conductor secured against loosening Applicable Protection by insulation

Measurements, testing performed on:
Measuring device used according to DIN VDE: Multimeter / Insulation tester

If multiple measurement results are obtained for the same test, always record the worst result!

Continuity of protective conductor system

Test current at least 10A/50Hz. The test must be performed between the PE terminal and various points that are part of the protective conductor system.

Limit Values
Cross Section
Max Voltage Drop
Compliant
Enter value!
Non-compliant
Enter value!
(corresponding
1.0 mm²
3.3V
-----------
-----------
Cross section
1.5 mm²
2.6V
-----------
-----------
mark!)
2.5 mm²
1.9V
-----------
-----------
 
4.0 mm²
1.4V
-----------
-----------
 
>6 mm²
1.0V
-----------
-----------

Insulation Resistance

Measured with 500V DC between the conductors of the power circuits and the protective conductor system.

Caution: Disconnect machine/system from mains, do not touch test probes!

Measured value must be >1M?!

Measurement
Compliant - Enter Value!
Non-compliant - Enter Value!
L1-PE
----------------------
----------------------
L2-PE
----------------------
----------------------
L3-PE
----------------------
----------------------
N-PE
----------------------
----------------------

If safety measurements are compliant, the system can now be connected to mains voltage!

Caution with the following voltage measurements!!!

Input Voltages

Measured with voltage measuring instrument between the phases and between phases and neutral conductor.

Measurement
Value
Measurement
Value
L1-L2
-------------------------
L1-N
-------------------------
L2-L3
-------------------------
L2-N
-------------------------
L1-L3
-------------------------
L3-N
-------------------------

Control Voltages

Measured with voltage measuring instrument. Record measurement location and value (e.g., transformer input, transformer output, PLC power supply DC voltage, etc.).

Measurement Location
Value
-------------------------------------------------------
-------------------------
-------------------------------------------------------
-------------------------
-------------------------------------------------------
-------------------------
-------------------------------------------------------
-------------------------
-------------------------------------------------------
-------------------------

Testing:

Testing refers exclusively to the safety devices listed below and is not a general functional test.

Applicable Emergency Stop Not Applicable Fuses Not Applicable Signaling and indicator devices
Not Applicable Interlocks Not Applicable Correct phase rotation for three-phase sockets

Execution of Measurements:

Signature

Name          Date          Signature