5.7 Output Test
| Output Test (PLC Operands) | Customer: | Sheet: 1/1 |
| Control Manufacturer: Siemens | Customer No.: | Date: 30.11.2006 |
| Control Type: S7 | Order No.: | |
| Plant No.: | Order Ref.: Conversion of two HPS conveyor belt models to three-phase drive and control via PROFIBUS-DP | |
| PLC Output / Operand | Reaction at Device: | Status of Device | Matches Assignment List? | ||
| A0.0 | HPSF_1_operation_green | 0 | H1.3 | 1 | Ok |
| A0.0 | HPSF_1_operation_green | 1 | H1.3 | 0 | Ok |
| A0.1 | HPSF_2_operation_green | 0 | H2.2 | 1 | Ok |
| A0.1 | HPSF_2_operation_green | 1 | H2.2 | 0 | Ok |
| A0.2 | Program_stop_red_HPSF_1 | 0 | H1.1 | 1 | Ok |
| A0.2 | Program_stop_red_HPSF_2 | 1 | H1.1 | 0 | Ok |
| A0.3 | Program_stop_red_HPSF_2 | 0 | H2.1 | 1 | Ok |
| A0.3 | Program_stop_red_HPSF_1 | 1 | H2.1 | 0 | Ok |
| A0.4 | Program_check | 0 | H1.2 | 1 | Ok |
| A0.4 | Program_check | 1 | H1.2 | 0 | Ok |