5.6 Input Test


Input Test (PLC Operands) Customer: Sheet: 1/1
Control Manufacturer: Siemens Customer No.: Date: 30.11.2006
Control Type: S7 Order No.:
Plant No.: Order Ref.: Conversion of two HPS conveyor belt models to three-phase drive and control via PROFIBUS-DP

 

Device to be tested PLC Operand Status
of Operand
Matches
Assignment List
S1 HPSF_1_stop Normally Open 0 E0.0 1 Ok
S1 HPSF_1_stop Normally Open 1 E0.0 0 Ok
S2 HPSF_1_right_slow Normally Closed 0 E0.1 1 Ok
S2 HPSF_1_right_slow Normally Closed 1 E0.1 0 Ok
S3 HPSF_1_right_fast Normally Closed 0 E0.2 1 Ok
S3 HPSF_1_right_fast Normally Closed 1 E0.2 0 Ok
S4 HPSF_1_left_slow Normally Closed 0 E0.3 1 Ok
S4 HPSF_1_left_slow Normally Closed 1 E0.3 0 Ok
S5 HPSF_1_left_fast Normally Closed 0 E0.4 1 Ok
S5 HPSF_1_left_fast Normally Closed 1 E0.4 0 Ok