5.7 Output Test


Output Test (PLC Operands) Customer: Sheet: 1/1
Control Manufacturer: Siemens Customer No.: Date: 30.11.2006
Control Type: S7 Order No.:
Plant No.: Order Ref.: Conversion of two HPS conveyor belt models to three-phase drive and control via PROFIBUS-DP

 

PLC Output / Operand Reaction at Device: Status of Device Matches Assignment List?
A0.0 HPSF_1_operation_green 0 H1.3 1 Ok
A0.0 HPSF_1_operation_green 1 H1.3 0 Ok
A0.1 HPSF_2_operation_green 0 H2.2 1 Ok
A0.1 HPSF_2_operation_green 1 H2.2 0 Ok
A0.2 Program_stop_red_HPSF_1 0 H1.1 1 Ok
A0.2 Program_stop_red_HPSF_2 1 H1.1 0 Ok
A0.3 Program_stop_red_HPSF_2 0 H2.1 1 Ok
A0.3 Program_stop_red_HPSF_1 1 H2.1 0 Ok
A0.4 Program_check 0 H1.2 1 Ok
A0.4 Program_check 1 H1.2 0 Ok